liyuan@starke.com.cn |
Detail Description of JUS Series Crawler Piling Rig
JUS crawler piling rig can be attached with drilling machine, hydraulic pile driver and diesel hammer. Its electric driving system features low energy consumption, low noise, low vibration and little pollution. The walking crawler and the 360-degree-turn tower contribute to its high working efficiency. The tower is convenient for lifting. The major and auxiliary winch can be controlled either synchronously or separately. JUS crawler piling rig moves and operates flexibly. It has a wide location adjustment range and high location adjustment precision.
Parameter Table of JUS Series Crawler Piling Rig
Model Technical parameter | Unit | JUS120 | JUS90 | JUS60 |
Length of chassis (projection) | mm | 6300 | 6000 | 4800 |
Width of chassis | mm | 5000 | 5000 | 4800 |
Mainframe transportation size | m | 19X3.2X3.2 | 18X3.2X3.2 | 10X3.0X3.2 |
Max. load | T | 40 | 25 | 15 |
Max. model with SWM method | 850 | 650 | ||
Max. model with drilling power head | 580 | 480 | 450 | |
Drilling depth | m | 30 | 28 | 27 |
Dia. of pile frame pipe | mm | 720 | 630 | 530 |
Max promoted force | T | 60 | 40 | 40 |
Max. drilling diameter | mm | 800 | 800 | 800 |
Climbing ability | % | 30 | 30 | 30 |
Max. driving load | T | 120 | 70 | 50 |
Grounding pressure | MPa | 0.1 | 0.1 | 0.1 |
Track shoe width | mm | 800 | 800 | 700 |
>> To See More Information of Technical Data and Dimensions |
>> Please Contart us with Specific Model |
1. High Working Efficiency
2. Wide Location Adjustment Range
3. Low Energy Consumption
--------- Video >>
Tube Pile, Square Pile, In Situ Pile
Steel Tube, H-Pile, Steel Board
Copyright © 2020 Guangzhou Weyes Network Technology Co., Ltd. | All Rights Reserved